🇸🇩

Khartoum

Country
Sudan
Population
5M
Projects
3
First project
2014
Best evidence
Independent
Last verified
15 August 2026

🤖 AI-generated city profile, summarising the source-checked entries below — how this works

Khartoum's three entries are all about what a city keeps when the rooms that ran it are gone. A private bank's app became the way people buy bread; the national payment switch was rebuilt while the grid it depends on was not; and an electricity utility that lost its control room still has its customer record. None of this was designed as war infrastructure. It is simply the part of the digital layer that turned out to be portable.

The atlas documents 3 projects in Khartoum: 3 still running without a verdict. Every entry carries an evidence grade — the strongest here is independent (1 entry) — and links its sources.

How Khartoum got smart

The rails were laid in peacetime and by different owners. Bank of Khartoum launched Bankak in 2014 as an ordinary mobile banking app, while Electronic Banking Services, the central bank's infrastructure arm, ran the country's payment switch and cheque clearing from the capital. Electricity was already billed in advance: the state holding company kept a geo-referenced database of prepaid consumers that is, in effect, the city's household register for power.

April 2023 turned all three into something else. With branches in Khartoum and Omdurman looted and cash supplies halted, the app became the default way to pay for groceries, transport and remittances — and the dependence cut both ways, going down for as long as four days at a stretch and disappearing entirely in the nationwide telecom blackout of February 2024. The same month RSF fighters took the national load dispatch centre, and the transmission company has run the grid manually ever since, coordinating by cell phone across a network split into a northern and a southern half.

The rebuilding has been uneven in a way the entries make legible. Cheque clearing was restored on 7 January 2026, the switch operator was accredited as Sudan's first SWIFT service bureau that June, and a new National Switch went live on 6 August 2026. The grid moved more slowly: by mid-2026 the energy ministry counted more than 20 substations rehabilitated and over 1,700 km of transmission lines repaired, while Khartoum still faced cuts of up to 18 hours a day.

Timeline (2014–2014)

All 3 projects in Khartoum

✔ Every published entry is checked against the public sources it cites before publication.

Outcome: 3 ongoing — Evidence: 1 independent · 1 official · 1 media

How the pieces connect

Editorial links between Khartoum's own entries — the city as a system, not a list.

What's next

Plans and announced trajectories — not yet documented results.

The gap worth watching is not technical. Payment rails came back faster than the grid that powers them — Sudan relaunched its national switch in the same week as its third nationwide blackout in seven days — and the utility that kept its meter fleet still announces cuts through ministry statements rather than a schedule residents can plan around. Neighbouring capitals publish exactly that: Bamako's utility posts when the power will go off. It is the humblest instrument in this field and the one Khartoum is still missing.

Deeper reads

Where Khartoum appears in the atlas's own analysis.

Closest comparisons

Two cities the atlas reads next to Khartoum — the reason first, then the entries it rests on. Chosen by hand from the Khartoum threads below, not counted out of them.

  1. 🇱🇷 Monrovia

    In both capitals the payment rail is what reaches people no bank branch does — and neither rail belongs to the city: one a state gateway dialled from any phone, the other a single private bank's app.

  2. 🇺🇦 Kyiv

    Two capitals at war, and the digital service each kept is the one people could not do without: Kyiv's city app grew into air-raid alerts, while Khartoum's payment rail was destroyed and rebuilt around a private bank's app.

Show 7 further city threadsShow fewer

Every editorial link from Khartoum's entries into another city, strongest first. Each one is a statement about two projects, not about two cities — the three above are the ones the atlas is willing to make at city level.

Official strategy and sources

Khartoum State — no system documented here is run by a city body: the payment rails belong to the Central Bank of Sudan's arm and to a private bank, the grid to the national utilityThe organization driving the city's smart-city work.
📎 Cite this city

1001 Smart Cities (2026). “Smart-city projects in Khartoum, Sudan.” The Smart City Atlas. https://1001smartcities.org/cities/khartoum/ (last verified 2026-08-15). Data: CC BY 4.0.

The underlying data is free to reuse with attribution — see the open data page.