Cairo Ring Road Bus Rapid Transit (BRT)
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
How this atlas is made · What “last verified” means · What “source-checked” means
The first 35 km opened on 3 July 2025: 14 stations, about 100 locally manufactured electric buses, running where informal microbuses used to. Two further phases are still to come, toward 48 stations.
what does this mean?
The strongest source is an independent non-academic evaluation: an audit office, a government or EU review, or an NGO. It grades who did the looking — not how well the project went. All four grades →Part of 1001 Smart Cities — 1,167 documented projects · 🏙️ 5 more in Cairo · 🚌 Public transport guide · 🚲 Mobility projects
A bus rapid transit line on the Greater Cairo Ring Road whose Phase 1 (35 km, 14 stations) entered full service on 3 July 2025, running in dedicated lanes with about 100 locally manufactured electric buses. The full network is planned to reach 48 stations across three phases at a cost of roughly EGP 9.5 billion, replacing informal microbus routes along the ring road.
Sources
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Cairo Ring Road Bus Rapid Transit (BRT)” — Cairo, Egypt. The Smart City Atlas. https://1001smartcities.org/projects/cairo-ring-road-brt/ (last verified 2026-07-18). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
