Harbin Daoli Automated District Heating Network
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
10 sourced claims on this page, none individually verified yet — turn on “Sources in the text” to see each one.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
Harbin automated Daoli's district heating in 2007: 156 self-operating stations replaced coal boiler rooms for about a million residents. The ≈300,000 tonnes of coal saved per year is ABB's own number.
what does this mean?
The strongest source is press reporting; no primary evaluation was located. It grades who did the looking — not how well the project went. All four grades →Part of 1001 Smart Cities — 1,167 documented projects · 🏙️ 5 more in Harbin · 🌡️ Heat & cooling guide · ⚡ Energy projects
Harbin's Daoli district became one of China's largest automated district-heating retrofits when ABB completed it in 2007: 156 self-operating heat-exchange stations replaced coal boiler rooms across 17.6 million square metres, serving about a million residents. Separately, Harbin Investment Group — the city's largest state-owned heating enterprise, carrying close to half of Harbin's heating — runs a smart-heating command platform over its own service area that automatically alerts operators to equipment or pipeline faults.
Sources
Show your work What this page rests on and what it can’t tell you · all 10 claims with their sources · the forensic record
Evidence Passport · public beta 10 addressable claims, 3 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 10
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-1017076a8b123b86
descriptive
one of China's largest automated district-heating retrofits
Sources carrying this claim
clm-3a148433d2715a25
quantitative
when ABB completed it in 2007
Sources carrying this claim
clm-3c176865a627b099
quantitative
156 self-operating heat-exchange stations replaced coal boiler rooms
Sources carrying this claim
clm-67687498722bcd50
quantitative
across 17.6 million square metres
Sources carrying this claim
clm-a50ec7a13bf9339f
quantitative
serving about a million residents
Sources carrying this claim
clm-6f2971310cd5527a
descriptive
smart-heating command platform
Sources carrying this claim
clm-c1c25460a4c003fe
descriptive
automatically alerts operators to equipment or pipeline faults
Sources carrying this claim
clm-16b0a78405864254
quantitative
≈300,000 tonnes of coal
Sources carrying this claim
clm-89b99d77b64362e3
quantitative
500,000-550,000 tonnes of CO2 saved per year at the Daoli system's 2007 completion
Sources carrying this claim
clm-74818fef11727e66
descriptive
(ABB-reported)
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:59a999c1ee87cf8f905c387b61fd4b7f531aa00c2d0967b5bd31b649e7592ee9
- 10
- of 10 claims mapped
- 3
- source dossiers
- 1
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Not recorded
- Actor types
- utility, city-government
- Funding model
- Not recorded
- Funding description
- Not recorded
- Cost
- Not recorded
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
3 source dossiers
Harbin Municipal Government (authority)
- Stable source ID
src-73072256e9e9bf03- Publisher
- Name not classified · harbin.gov.cn
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-02
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Oct 2024 heating-season article confirming the citywide smart-heating command platform (101 boilers, 1,557 heat-exchange stations, 3,277 heat-exchange units) with automatic fault alarms.
- Claims linked
DESMI — Harbin Daoli district heating case study (industry)
- Stable source ID
src-bfdf38b1a49d0ec2- Publisher
- Name not classified · desmi.com
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-02
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
156 automated heat-exchange stations, 17.58 million m², ~1 million residents, completed 2007 by general contractor ABB.
Climate Action — ABB in China (press)
- Stable source ID
src-301d02438f91c1e1- Publisher
- Name not classified · climateaction.org
- Type / language
- web-page · language not classified
- Published
- 2008-07-07
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-02
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Independent press corroboration of the 2007 completion, Daoli district scope, and CO2 savings figure.
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Harbin Daoli Automated District Heating Network” — Harbin, China. The Smart City Atlas. https://1001smartcities.org/projects/harbin-smart-heating/ (last verified 2026-08-02). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
