Metro Line 7 GoA4 Automated Operation
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
15 sourced claims on this page, none individually verified yet — turn on “Sources in the text” to see each one.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
✎ Corrected 21 Aug 2026 3 claims added. What changed →
Jiangsu's first metro line designed to run without a driver opened in three pieces over three Decembers. Nanjing's own wording never quite closes the loop: the trains have the capability to run driverless.
what does this mean?
The strongest source is press reporting; no primary evaluation was located. It grades who did the looking — not how well the project went. All four grades →Part of 1001 Smart Cities — 1,167 documented projects · 🏙️ 8 more in Nanjing · 🚌 Public transport guide · 🚲 Mobility projects
Line 7 is the first Nanjing metro line designed to GoA4, the highest automation grade: trains wake themselves, leave the depot, run the line, berth, open and close doors and return to sleep on a timetable. It opened in three sections — north on 28 December 2022, south in 2023, centre on 28 December 2024 — completing a 35.49 km, 27-station line. CRRC Puzhen built 53 trainsets certified to SIL4 for their onboard safety functions, with obstacle and derailment detection and active smoke detection.
📊 Impact
The north section alone averaged 50,200 riders a day by the end of 2023; with the south section open, the line set a single-day record of 153,000 on 3 April 2024. Completing it took the Nanjing network from about 473 km and 226 stations to about 484 km and 234 stations across 13 lines.
🎓 Lesson
Read the operator's grammar. Every Nanjing and Jiangsu announcement says the trains 具备无须配置司机的能力 — have the capability to be run without a driver — which is a statement about the design, not about who is aboard. Pre-opening reports said plainly that a driver would still ride and watch the console, and no accessible source names a date on which staff stopped riding. A GoA4 line is a purchase; unattended operation is a decision taken later, if at all.
Sources
Show your work What this page rests on and what it can’t tell you · all 15 claims with their sources · the forensic record
Evidence Passport · public beta 15 addressable claims, 5 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 15
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-fd3e359264d5c561
quantitative
the first Nanjing metro line designed to GoA4, the highest automation grade
Sources carrying this claim
clm-236563796a7aeb25
descriptive
trains wake themselves, leave the depot, run the line, berth, open and close doors and return to sleep on a timetable
Sources carrying this claim
clm-4fd1469fb3db90ea
quantitative
It opened in three sections — north on 28 December 2022
Sources carrying this claim
clm-de0fbab3856e9df6
quantitative
south in 2023
Sources carrying this claim
clm-96ccc2a5d4a95dcf
quantitative
centre on 28 December 2024
Sources carrying this claim
clm-44854b2de0ea792f
quantitative
completing a 35.49 km, 27-station line
Sources carrying this claim
clm-2e873269e83b930e
quantitative
CRRC Puzhen built 53 trainsets
Sources carrying this claim
clm-a44a515c966bcb5f
quantitative
certified to SIL4 for their onboard safety functions, with obstacle and derailment detection and active smoke detection
Sources carrying this claim
clm-7096ce117bfab43c
quantitative
The north section alone averaged 50,200 riders a day by the end of 2023
Sources carrying this claim
clm-1c4911b17876923e
quantitative
the line set a single-day record of 153,000 on 3 April 2024
Sources carrying this claim
clm-2936282d90c6b9bf
quantitative
from about 473 km and 226 stations to about 484 km and 234 stations
Sources carrying this claim
clm-87b3eaad6afab752
quantitative
across 13 lines
Sources carrying this claim
clm-70a4ba426fa6bd3e
descriptive
Every Nanjing and Jiangsu announcement says the trains 具备无须配置司机的能力 — have the capability to be run without a driver — which is a statement about the design, not about who is aboard
Sources carrying this claim
clm-37a833c06f31eb44
descriptive
Pre-opening reports said plainly that a driver would still ride and watch the console
Sources carrying this claim
clm-542d91fd236a7de3
descriptive
no accessible source names a date on which staff stopped riding
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:13cf01ab920a014296bc3e36943cacbb5cde7efb27865449d14aa3eafb07d477
- 15
- of 15 claims mapped
- 5
- source dossiers
- 3
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Nanjing Metro Group Co., Ltd. (南京地铁集团有限公司), Line 7 branch
- Actor types
- city-government
- Funding model
- public
- Funding description
- Not recorded
- Cost
- Not recorded
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
5 source dossiers
Xinhua Daily / Jiangsu provincial party news site (state media)
- Stable source ID
src-4293e0ea0726e505- Publisher
- Name not classified · zgjssw.gov.cn
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-06
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Full-line opening, 29 Dec 2024. Carries the careful wording: 『作为江苏省首条全自动无人驾驶列车线路』 and 『具备无须配置司机、完全自动化运行的能力』 — capability, not practice. Also 『12月28日13时30分…全线实现贯通运营』, 『7号线全线长约35.5公里』, 『设27个车站』, 『南京地铁运营总里程由近473公里增加至近484公里』.
Nanjing Release / The Paper (municipal information account)
- Stable source ID
src-76db3d459f766e70- Publisher
- Name not classified · m.thepaper.cn
- Type / language
- web-page · language not classified
- Published
- 2024-12-26
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-06
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
26 Dec 2024. Source for the length 『全长35.49公里』, 『全线27个车站』 and the ridership figures: 『截至2023年底,北段的日均客流量已经达到5.02万人次。今年4月3日,7号线(南段+北段)更是创下了15.3万人次的单日最高客运量』. Repeats the same capability wording.
CRRC Nanjing Puzhen (manufacturer)
- Stable source ID
src-e69476f1897b14d3- Publisher
- Name not classified · crrcgc.cc
- Type / language
- web-page · language not classified
- Published
- 2025-01-16
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-06
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
16 Jan 2025. Builder's own account: 53 trainsets, B-type, 80 km/h, SIL4 to EN50128/EN50129, automatic fault self-recovery, obstacle and derailment detection, active smoke detection, 50-minute fire-rated cabinets. Operator-grade evidence, used only for the hardware description.
Yangtze Evening Post via China Metro (media)
- Stable source ID
src-2ea70905767e1819- Publisher
- Name not classified · chinametro.net
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-06
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Pre-construction report on the Line 7 feasibility review. The passage that matters for the driverless test: 『很多乘客以为,既然列车全自动了,列车上就没有司机了…其实真相是,地铁列车上仍然还有司机,不过司机从繁忙的工作中彻底解放出来了,专注于监测地铁列车的正常运行』 — there is still a driver aboard, watching the console.
CRI Jiangsu (state media)
- Stable source ID
src-4ddabd7d8463f7f2- Publisher
- Name not classified · js.cri.cn
- Type / language
- web-page · language not classified
- Published
- 2018-04-24
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-06
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
24 Apr 2018, construction start. 『这条线路将实现真正意义的"无人驾驶",司机只需在驾驶室监控列车运行』 — the driver only monitors. Note the sources disagree on whether there is a cab at all: this 2018 piece says 驾驶室, while the delivered trains have an open console. Neither states when, or whether, staff stopped riding.
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Metro Line 7 GoA4 Automated Operation” — Nanjing, China. The Smart City Atlas. https://1001smartcities.org/projects/nanjing-metro-line7-driverless/ (last verified 2026-08-06). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
