Tashkent Water Transformation Plan (SUEZ)
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
8 sourced claims on this page, none individually verified yet — turn on “Sources in the text” to see each one.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
Tashkent handed a French utility a 7-year contract to hunt down 30,000 leaks and hook 650,000 meters to a new control room — a bet on plumbing, not software, to fix a leaking network.
what does this mean?
The strongest source is press reporting; no primary evaluation was located. It grades who did the looking — not how well the project went. All four grades →Part of 1001 Smart Cities — 1,167 documented projects · 🏙️ 1 more in Tashkent · 💧 Water guide · 📡 Data & IoT projects
The Tashkent Water Transformation Plan, run with SUEZ since August 2023, commits to identifying 30,000 leaks to cut water abstraction by 33 million cubic metres a year, to installing 650,000 smart meters and to opening a new Operations Center — aiming for a 12% cut in non-revenue water over the 7-year, €142M contract.
Sources
Show your work What this page rests on and what it can’t tell you · all 8 claims with their sources · the forensic record
Evidence Passport · public beta 8 addressable claims, 2 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 8
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-74f7984110e4b531
descriptive
The Tashkent Water Transformation Plan
Sources carrying this claim
clm-360edb4bfbde34bb
quantitative
run with SUEZ since August 2023
Sources carrying this claim
clm-a2e26c17108f518d
quantitative
commits to identifying 30,000 leaks
Sources carrying this claim
clm-d7776009058d4d5f
quantitative
to cut water abstraction by 33 million cubic metres a year
Sources carrying this claim
clm-ebc02059b81888ff
quantitative
to installing 650,000 smart meters
Sources carrying this claim
clm-0307868831095d5c
descriptive
to opening a new Operations Center
Sources carrying this claim
clm-a753b829ac5cab6e
quantitative
aiming for a 12% cut in non-revenue water
Sources carrying this claim
clm-897ec7e35dc449d6
quantitative
over the 7-year, €142M contract
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:f8e3a0ca5d79d9753ab3c9d33b1db8a988e62dd52a252a8c7b8a5bd4a4483a22
- 8
- of 8 claims mapped
- 2
- source dossiers
- 1
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Uzsuvtaminot with SUEZ
- Actor types
- utility, private
- Funding model
- mixed
- Funding description
- Not recorded
- Cost
- €142M (7-year contract)
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
2 source dossiers
Uzsuvtaminot (operator)
- Stable source ID
src-46f615d3b0425809- Publisher
- Name not classified · uzsuv.uz
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-02
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Official national utility portal tracing smart infrastructure transitions.
- Claims linked
- Background source; no baseline claim points here
SUEZ (partner)
- Stable source ID
src-ce0b0855662f351b- Publisher
- Name not classified · suez.com
- Type / language
- web-page · language not classified
- Published
- 2023-09-22
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-02
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Page of a partner involved in delivering the project.
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Tashkent Water Transformation Plan (SUEZ)” — Tashkent, Uzbekistan. The Smart City Atlas. https://1001smartcities.org/projects/tashkent-scada-water/ (last verified 2026-08-02). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
