Tashkent Water Transformation Plan (SUEZ)

🤖 AI-generated summary · ◆ 8 sourced claims · 🔎 Last verified

This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.

8 sourced claims on this page, none individually verified yet — turn on “Sources in the text” to see each one.

How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page

Tashkent handed a French utility a 7-year contract to hunt down 30,000 leaks and hook 650,000 meters to a new control room — a bet on plumbing, not software, to fix a leaking network.

Evidence📰 Mediagrades the sourcing — this entry states no impact figure
what does this mean?The strongest source is press reporting; no primary evaluation was located. It grades who did the looking — not how well the project went. All four grades →
Scale🏙️ City-wide
Cost€142M (7-year contract)

Part of 1001 Smart Cities — 1,167 documented projects · 🏙️ 1 more in Tashkent · 💧 Water guide · 📡 Data & IoT projects

The Tashkent Water Transformation Plan, run with SUEZ since August 2023, commits to identifying 30,000 leaks to cut water abstraction by 33 million cubic metres a year, to installing 650,000 smart meters and to opening a new Operations Centeraiming for a 12% cut in non-revenue water over the 7-year, €142M contract.

Live 📅 since 2023

Sources

↗ Uzsuvtaminot (operator)Official national utility portal tracing smart infrastructure transitions.
↗ SUEZ (partner)Published 22 September 2023Page of a partner involved in delivering the project.
Show your work What this page rests on and what it can’t tell you · all 8 claims with their sources · the forensic record

Evidence Passport · public beta 8 addressable claims, 2 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.

Inspect the claims, one by one — verbatim text, sources and caveats for all 8

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-74f7984110e4b531 descriptive
The Tashkent Water Transformation Plan
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The SUEZ press release names the project and its parties: “The ‘Tashkent Water Transformation Plan’, implemented in collaboration with the Uzbek authorities, came into effect in August.” It adds that “the Municipality of Tashkent, together with Uzsuvtaminot, have designed and launched the ‘Tashkent Water Transformation Plan’ project together with their trusted partner SUEZ”, and identifies the city’s own water company as “Tashkent Shahar SuvTaminoti (TSST)”.
Caveat
The plan is described by SUEZ, the contractor. The utility page listed alongside it is a JavaScript-only portal that returns no readable text, so no operator publication of its own confirms the project.

Sources carrying this claim

  1. SUEZ (partner)
Claim 2 clm-360edb4bfbde34bb quantitative
run with SUEZ since August 2023
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The release states that the plan “came into effect in August” and that the contract “is between SUEZ, the National Water Company ‘Uzsuvtaminot’, the Municipality of Tashkent and the Ministry of Construction, Housing and Communal Services.”
Caveat
The release names the month but not the year; 2023 follows from its own publication date of 22 September 2023. SUEZ’s role is described as support rather than operation: 14 international specialists and 45 local staff “will provide day-to-day support to the 4,000 Uzbek water company Tashkent Shahar SuvTaminoti employees.”

Sources carrying this claim

  1. SUEZ (partner)
Claim 3 clm-a2e26c17108f518d quantitative
commits to identifying 30,000 leaks
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Among the contract’s components the release lists “A reduction in water losses by identifying 30,000 leaks using innovative methods.”
Caveat
The source commits to identifying 30,000 leaks, not to repairing them, and reports no number of leaks found or fixed so far.

Sources carrying this claim

  1. SUEZ (partner)
Claim 4 clm-d7776009058d4d5f quantitative
to cut water abstraction by 33 million cubic metres a year
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The same bullet continues: “It will reduce water abstraction by 33 million m3 per year by the end of the project, equivalent to the annual consumption of an Uzbek town of 330,000 inhabitants.”
Caveat
This is a figure for the end of the seven-year contract, not a reduction that has been measured.

Sources carrying this claim

  1. SUEZ (partner)
Claim 5 clm-ebc02059b81888ff quantitative
to installing 650,000 smart meters
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The release lists as a contract component: “Moreover, the installation of 650,000 smart meters will allow accurate billing.”
Caveat
The figure is a contract deliverable stated in the future tense; the source gives no count of meters actually installed.

Sources carrying this claim

  1. SUEZ (partner)
Claim 6 clm-0307868831095d5c descriptive
to opening a new Operations Center
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The contract includes “The implementation of the latest digital solutions in a new Operations Center using smart decision-making tools enabling water and energy consumption reductions, to preserve resources and prioritize investments.”
Caveat
The source describes a new Operations Center with digital decision-making tools, but never uses the word SCADA and does not say the centre has opened.

Sources carrying this claim

  1. SUEZ (partner)
Claim 7 clm-a753b829ac5cab6e quantitative
aiming for a 12% cut in non-revenue water
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The contract rests on “an action plan to improve the quality of drinking water, reduce the Non-Revenue Water by 12 %, and increase the Collection rate in order to achieve financial balance.”
Caveat
This is a contract target rather than an achieved result, and the source states no starting non-revenue water rate, so the 12 per cent cannot be read as a level reached or aimed at.

Sources carrying this claim

  1. SUEZ (partner)
Claim 8 clm-897ec7e35dc449d6 quantitative
over the 7-year, €142M contract
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
“The 7-year contract worth €142 million, aims to modernize the Uzbek capital’s water and wastewater services and to improve the management of its water company, Tashkent Shahar SuvTaminoti (TSST).” The release adds that it “is financed by a Direct Loan from the French Treasury and a BPI France Assurance Export buyer’s credit.”
Caveat
Term and value are stated by the company holding the contract; no procurement or budget document is linked.

Sources carrying this claim

  1. SUEZ (partner)
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-21-evidence-baseline effective 2026-08-02 · created 2026-08-22

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:f8e3a0ca5d79d9753ab3c9d33b1db8a988e62dd52a252a8c7b8a5bd4a4483a22
8
of 8 claims mapped
2
source dossiers
1
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Uzsuvtaminot with SUEZ
Actor types
utility, private
Funding model
mixed
Funding description
Not recorded
Cost
€142M (7-year contract)
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

2 source dossiers

Uzsuvtaminot (operator) uzsuv.uz · background

Open original source ↗

Stable source ID
src-46f615d3b0425809
Publisher
Name not classified · uzsuv.uz
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-02
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Official national utility portal tracing smart infrastructure transitions.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
SUEZ (partner) suez.com · 8 linked claims

Open original source ↗

Stable source ID
src-ce0b0855662f351b
Publisher
Name not classified · suez.com
Type / language
web-page · language not classified
Published
2023-09-22
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-02
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Page of a partner involved in delivering the project.

Descriptive only — not page/paragraph exact
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
📎 Cite this project

1001 Smart Cities (2026). “Tashkent Water Transformation Plan (SUEZ)” — Tashkent, Uzbekistan. The Smart City Atlas. https://1001smartcities.org/projects/tashkent-scada-water/ (last verified 2026-08-02). Data: CC BY 4.0.

The underlying data is free to reuse with attribution — see the open data page.

✉️ Get the next source-checked smart-city project in your inbox

One short email a week: the Landmark, one Insight, the new cities. No spam, one-click unsubscribe. About the newsletter · RSS