Austin Energy SHINES: Solar-Storage Grid Management Pilot
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
How this atlas is made · What “last verified” means · What “source-checked” means
Branded a 'microgrid strategy,' this DOE-funded pilot never added islanding capability — it built DERMS software to coordinate batteries and solar, then wound down in 2020.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →Part of 1001 Smart Cities — 1,167 documented projects · 🏙️ Austin city profile · ☀️ Solar & PV guide · ⚡ Energy projects
Austin Energy's DOE-funded SHINES pilot (2016-2020, a $4.3m federal SETO grant matched by the utility) built a Distributed Energy Resource Management System coordinating 1.5MW battery systems at the Mueller and Kingsbury solar sites with demand response. It produced a replicable software template, not an islanding microgrid.
Sources
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Austin Energy SHINES: Solar-Storage Grid Management Pilot” — Austin, United States. The Smart City Atlas. https://1001smartcities.org/projects/austin-smart-grid/ (last verified 2026-08-02). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
