Maputo-KaTembe Bridge & Ring Road Tolling (REVIMO)
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
How this atlas is made · What “last verified” means · What “source-checked” means
Africa's longest suspension bridge pays for itself at the toll plaza — until drivers blockaded it in January 2025 and the state cut the car toll from 125 to 100 meticais. An ANPR pilot now clears vehicles in 3 seconds instead of 30.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →Part of 1001 Smart Cities — 1,167 documented projects · 🏙️ 2 more in Maputo · 🎫 Smart ticketing guide · 🚲 Mobility projects
Since November 2018 the 3,041 m Maputo-KaTembe bridge — reported as Africa's longest suspension bridge at opening, built by China Road and Bridge Corporation with roughly 85% of its ~$726-785 million cost on a 20-year, 4% China Exim Bank credit — has linked the municipal districts of Nlhamankulu and KaTembe, tolled by concessionaire REVIMO, which also runs the plazas on Maputo's ring road. The data layer is the payment side: class-based tariffs, prepaid frequent-user cards, and a register of KaTembe residents who pay a reduced rate; in March 2026 REVIMO reported a licence-plate-recognition pilot at the ring-road plazas cutting passage time from about 30 to 3 seconds. Tolling has been politically fragile: collection was suspended for weeks during the 2024-25 post-electoral protests, its resumption on 27 January 2025 was met by drivers blockading the plaza and crossing on foot past a heavy police presence, and from 15 May 2025 the government cut tariffs — the class-1 car rate to 100 meticais (from 125, originally 160) and both registered KaTembe residents and public-transport chapas to 40.
📊 Impact
REVIMO reports its March 2026 automatic licence-plate-reading pilot on the Maputo ring-road plazas cut passage time from about 30 to 3 seconds (operator figure, pilot phase only); no independent traffic or revenue evaluation of the toll system has been published.
🎓 Lesson
A toll meant to repay an export credit meets its limit where affordability does: after weeks of suspension and a plaza blockade, it was the government — not the concession's pricing model — that set the rates.
Sources
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Maputo-KaTembe Bridge & Ring Road Tolling (REVIMO)” — Maputo, Mozambique. The Smart City Atlas. https://1001smartcities.org/projects/maputo-katembe-bridge-tolling/ (last verified 2026-08-07). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.