Metro Tunnel High Capacity Signalling (CBTC)

🤖 AI-generated summary · 🔎 Last verified

This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.

How this atlas is made · What “last verified” means · What “source-checked” means

Australia's first brownfield moving-block signalling opened on 30 November 2025. High capacity signalling is not a synonym for driverless: a driver stays on board for doors, supervision and emergencies.

Evidence🏛️ Official
what does this mean?The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →
Scale🗺️ Regional

Part of 1001 Smart Cities — 1,167 documented projects · 🏙️ 9 more in Melbourne · 🚌 Public transport guide · 🚲 Mobility projects

Melbourne's 9km twin-tunnel Metro Tunnel, opened 30 November 2025, runs on Alstom's Urbalis Flo CBTC — Australia's first brownfield moving-block signalling install. Trains keep an onboard driver (automatic train operation, not driverless) while headways tighten toward 24 trains/hour; all five new stations have platform screen doors.

Live 📅 since 2025

📊 Impact

24 trains/hour maximum signalling capacity (a train roughly every 2.5 minutes) once all rolling stock carries CBTC equipment; ~18/hour at opening. From the 1 Feb 2026 'Big Switch' timetable, Sunbury/Cranbourne/Pakenham line trains run through the tunnel at least every 10 minutes, 6am-9pm.

🎓 Lesson

'High capacity signalling' and CBTC are not synonyms for driverless operation — Melbourne's system is GoA2 (automatic train operation with a driver retained onboard for doors, supervision and emergencies), the same automation tier as many modernized European ETCS lines, not the GoA4 unattended operation used on genuinely driverless metros elsewhere in the atlas.

Sources

↗ Alstom / CriticalComms — Metro Tunnel opens with CBTCconfirms Urbalis Flo CBTC, driver-onboard ATO, platform screen doors, 30 Nov 2025 opening
↗ Wikipedia — Metro Tunnelopening dates, five stations, tunnel length, cost history, full-height PSDs
↗ Wikipedia — High Capacity Metro Trainconfirms trains are never in motion without a human driver; CITYFLO 650 CBTC lineage
↗ Victorian Government — Big Switch timetable1 Feb 2026 full timetable: ≥10-minute frequency 6am-9pm through the tunnel
↗ CBD News — Metro Tunnel cost blowoutcost rose from ~A$11bn (2017 estimate) to ~A$15.5bn final
📎 Cite this project

1001 Smart Cities (2026). “Metro Tunnel High Capacity Signalling (CBTC)” — Melbourne, Australia. The Smart City Atlas. https://1001smartcities.org/projects/melbourne-metro-tunnel-signalling/ (last verified 2026-08-01). Data: CC BY 4.0.

The underlying data is free to reuse with attribution — see the open data page.

✉️ Get the next source-checked smart-city project in your inbox

One short email a week: the Landmark, one Insight, the new cities. No spam, one-click unsubscribe. About the newsletter · RSS