SRT (Smart Roadway Transit) Nagoya Station–Sakae Busway
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
8 sourced claims on this page, none individually verified yet — turn on “Sources in the text” to see each one.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
Nagoya's newest transit line isn't a subway or a tram — it's a 122-seat articulated bus with real-time GPS tracking, running just Friday through Monday between the station and Sakae.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →Part of 1001 Smart Cities — 1,167 documented projects · 🏙️ 5 more in Nagoya · 🚌 Public transport guide · 🚲 Mobility projects
Nagoya opened SRT (Smart Roadway Transit) on 13 February 2026: a 5.6 km, seven-stop corridor linking Nagoya Station and Sakae, run by the city's Housing and Urban Development Bureau with Meitetsu Bus operating the vehicles. Its 18-metre, 122-passenger articulated bus carries a real-time position-tracking system riders can check online, plus digital signage at stops. For now the line runs only Friday through Monday, several trips a day.
Sources
Show your work What this page rests on and what it can’t tell you · all 8 claims with their sources · the forensic record
Evidence Passport · public beta 8 addressable claims, 4 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 8
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-7dc4e7088b28112c
quantitative
Nagoya opened SRT (Smart Roadway Transit) on 13 February 2026
Sources carrying this claim
clm-1cabfdd8d70844a1
quantitative
a 5.6 km, seven-stop corridor linking Nagoya Station and Sakae
Sources carrying this claim
clm-a335403c88052fc8
descriptive
with Meitetsu Bus operating the vehicles
Sources carrying this claim
clm-690cc8b8628b5b8b
quantitative
Its 18-metre, 122-passenger articulated bus
Sources carrying this claim
clm-3f0b48e8b4538b38
descriptive
carries a real-time position-tracking system riders can check online
Sources carrying this claim
clm-2c388b81f6f6c4f7
descriptive
plus digital signage at stops
Sources carrying this claim
clm-8c5b69229d117000
descriptive
For now the line runs only Friday through Monday
Sources carrying this claim
clm-8bbc75f5eb123691
descriptive
several trips a day
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:4d2b8e913afc567cad1e561bed3f7890bb8756615474f0a327d9e033f2aa1748
- 8
- of 8 claims mapped
- 4
- source dossiers
- 2
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Nagoya City Housing and Urban Development Bureau (buses operated by Meitetsu Bus)
- Actor types
- utility, private
- Funding model
- ppp
- Funding description
- Not recorded
- Cost
- Not recorded
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
4 source dossiers
SRT Nagoya official site
- Stable source ID
src-921444118bfe5e35- Publisher
- Name not classified · srt.city.nagoya.jp
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-02
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
official city project site (route, real-time tracking); JS-rendered, could not be fetched directly, referenced via search snippets
Meitetsu Bus — SRT service announcement
- Stable source ID
src-eb96349f5e7aad14- Publisher
- Name not classified · meitetsu-bus.co.jp
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-02
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
confirms operator (Meitetsu Bus), 13 February 2026 launch, Nagoya Station–Sakae route
- Claims linked
NTT West Digre — SRT smart features
- Stable source ID
src-3b45f4a1348fa2dd- Publisher
- Name not classified · ntt-west.co.jp
- Type / language
- web-page · language not classified
- Published
- 2026-04-30
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-02
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
describes the real-time vehicle position tracking system and stop-side digital signage
MICE Times — SRT as Nagoya's smart public-transport project
- Stable source ID
src-54ada2d7f7587aa2- Publisher
- Name not classified · micetimes.jp
- Type / language
- web-page · language not classified
- Published
- 2025-10-28
- Updated
- 2026-03-06
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-02
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
context: city-led project, 5.6 km/seven-stop route, launch date, BRT/LRT comparison
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “SRT (Smart Roadway Transit) Nagoya Station–Sakae Busway” — Nagoya, Japan. The Smart City Atlas. https://1001smartcities.org/projects/nagoya-srt-brt/ (last verified 2026-08-02). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
