Oxagon
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
How this atlas is made · What “last verified” means · What “source-checked” means
Saudi Arabia's first remote-controlled port cranes arrived in 2025, but they're going into a terminal that won't fully open until 2026 — while the interim port next to it has already been moving cargo since 2022.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →Part of 1001 Smart Cities — 1,167 documented projects · 🏙️ 1 more in NEOM · 📡 Sensors & IoT guide · 🚲 Mobility projects
Port of NEOM's Oxagon terminal was 68% built as of December 2025. An interim port on the same site has moved cargo and ferry traffic since August 2022, handling about 250,000 TEU a year. In May 2025 it received Saudi Arabia's first fully automated, remote-controlled cranes — ZPMC-built, with AI-assisted fleet management — ahead of Terminal 1's 2026 opening, as Phase 2 dredging began toward a 1.5-million-TEU target by 2030.
Sources
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Oxagon” — NEOM, Saudi Arabia. The Smart City Atlas. https://1001smartcities.org/projects/neom-oxagon/ (last verified 2026-08-02). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
