West Alexandria's Grid Control Centre and the Meters That Have Not Arrived
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
14 sourced claims on this page, none individually verified yet — turn on “Sources in the text” to see each one.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
The control room works. Four years after the contract and more than a year after the schedule ran out, 5,000 of 300,000 smart meters were connected — the half that would show where the losses are.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →Part of 1001 Smart Cities — 1,167 documented projects · 🏙️ 3 more in Alexandria · 🔌 Smart grid & energy guide · ⚡ Energy projects
In September 2022 Siemens took a contract of about €50 million, financed by a Japanese ODA loan, to build two advanced distribution management systems for the Alexandria Electricity Distribution Company — one for the West Alexandria region, one to supervise every distribution control centre in the city — plus an Esri geographic information system and 300,000 smart meters, over thirty months. When the prime minister inspected the West centre at New Borg El Arab on 7 June 2026 it was running ADMS across 12 transformer stations, 56 distribution units and 100 smart panels for roughly a million subscribers along the western coastal strip, and 5,000 of the meters had been installed.
Sources
Show your work What this page rests on and what it can’t tell you · all 14 claims with their sources · the forensic record
Evidence Passport · public beta 14 addressable claims, 3 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 14
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-417d210efe14c801
quantitative
In September 2022 Siemens took a contract of about €50 million, financed by a Japanese ODA loan
Sources carrying this claim
clm-8548c53edcd73b1e
descriptive
to build two advanced distribution management systems for the Alexandria Electricity Distribution Company
Sources carrying this claim
clm-2531875c796ff1d3
descriptive
one for the West Alexandria region, one to supervise every distribution control centre in the city
Sources carrying this claim
clm-3b2c3160528b602d
descriptive
plus an Esri geographic information system
Sources carrying this claim
clm-a4ade326f0a342e8
quantitative
and 300,000 smart meters
Sources carrying this claim
clm-89a832eee337d067
descriptive
over thirty months
Sources carrying this claim
clm-27f36383af54e8a2
quantitative
When the prime minister inspected the West centre at New Borg El Arab on 7 June 2026
Sources carrying this claim
clm-44acbe5fe89897d0
descriptive
it was running ADMS
Sources carrying this claim
clm-5c1efe83c19b43ef
quantitative
across 12 transformer stations, 56 distribution units and 100 smart panels
Sources carrying this claim
clm-6663abdeff35574f
quantitative
for roughly a million subscribers along the western coastal strip
Sources carrying this claim
clm-6f6019182df05c66
quantitative
and 5,000 of the meters had been installed
Sources carrying this claim
clm-6b341c6b77edcb60
descriptive
Buying the control room and the meters in one contract does not make them arrive together.
Sources carrying this claim
clm-3af46ee64a69436a
descriptive
Alexandria has the supervisory layer over its grid years before the measurement layer underneath it
Sources carrying this claim
clm-d63626b2c1fec751
descriptive
the meters are the half that would locate the losses the loan was signed to reduce
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:5ab4397ffdedc72297858e8ab604db66f714b3f6fd8977c825c93659a9bb85bd
- 14
- of 14 claims mapped
- 3
- source dossiers
- 2
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Alexandria Electricity Distribution Company (AEDC); systems supplied by Siemens
- Actor types
- utility, private
- Funding model
- public
- Funding description
- JICA (Japan) concessional loan to the Ministry of Electricity and Renewable Energy, signed 10 February 2022
- Cost
- about €50 million for the Alexandria lot, within a programme of about €150 million
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
3 source dossiers
Siemens press release, 8 September 2022 (vendor)
- Stable source ID
src-b05cca32a5838324- Publisher
- Name not classified · press.siemens.com
- Type / language
- web-page · language not classified
- Published
- 2022-09-08
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-06
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Scope: two ADMS for the supervisory and West Alexandria distribution control centres, 300,000 smart meters with AMI hardware and software, Esri GIS; about EUR 50 million; JICA-funded; 30 months' implementation. Part of a ~EUR 150 million programme across AEDC, North Cairo and North Delta.
Nile TV News, 7 June 2026 (state media)
- Stable source ID
src-9cff69c01d552bfa- Publisher
- Name not classified · nile.eg
- Type / language
- web-page · language not classified
- Published
- 2026-06-07
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-06
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Prime-ministerial inspection 7 June 2026 of the West Control Centre in New Borg El Arab: 12 transformer stations, 56 distribution units, 100 smart panels, 50 medium-voltage capacitors, about one million subscribers between km 21 and km 67 of the coastal road; '5,000 smart meters have been installed as part of a 300,000-unit project in western Alexandria'.
Egyptian Ministry of International Cooperation — project record
- Stable source ID
src-e3d5663ede4fe481- Publisher
- Name not classified · moic.gov.eg
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-06
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
'Electricity Distribution System Improvement Project Alexandria, North Cairo, and North Delta', JICA loan signed 2022-02-10, objective 'Reduce the loss of energy and to improve the reliability and efficiency of the electricity distribution network'.
- Claims linked
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “West Alexandria's Grid Control Centre and the Meters That Have Not Arrived” — Alexandria, Egypt. The Smart City Atlas. https://1001smartcities.org/projects/alexandria-electricity-adms/ (last verified 2026-08-06). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
