ASKİ SCADA Network and Ankara's Water Losses

🤖 AI-generated summary · ◆ 6 sourced claims · 🔎 Last verified

This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.

6 sourced claims on this page, none individually verified yet — turn on “Sources in the text” to see each one.

How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page

✎ Updated 22 Aug 2026 Publication date recorded for 5 sources. What changed →

Ankara has the control room, the district metering areas and the telemetry. It also loses 42% of its drinking water — more than twice Istanbul's 18.6%. ASKİ's own strategic plan lists the loss rate among its weaknesses.

Evidence🏛️ Official
what does this mean?The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →
Scale🏙️ City-wide

Part of 1001 Smart Cities — 1,167 documented projects · 🏙️ 6 more in Ankara · 💧 Water guide · 📡 Data & IoT projects

ASKİ runs Ankara's drinking-water network from a single SCADA control centre, staffed around the clock, with reservoirs, pump stations and network measurement points reporting in so that leaks and failures can be found without waiting for a burst to surface. The instrumentation is real and long-standing. The result is not: the utility's own 2025-2029 strategic plan opens the planning period at a 42% loss rate and sets 25% as the target for 2029. The same plan lists "high loss rate" among ASKİ's self-declared weaknesses and records SCADA renewal as 0% complete in 2025, due to reach 100% only in 2029. No start year for the original SCADA system could be established from any source, so none is claimed here.

Live

🎓 Lesson

Instrumentation and consequence are different purchases. Ankara and Istanbul run the same architecture — SCADA, district metering areas, pressure and night-flow monitoring — and the gap between 18.6% and 42% is not explained by which of them owns the technology. A control room tells you where the water is going; it does not replace the pipe.

Sources

↗ ASKİ (operator) — 2025-2029 Strategic Plan, PDFPrimary source, text extracted directly. Core performance indicator table gives plan-period opening value 42 and end-of-plan target 25 for "Kayıp Kaçak Oranı (%)". Strategic goal 1.5 is "Kayıp kaçak oranını düşürmek". The SWOT lists "Kayıp kaçak oranının yüksek olması" as a weakness and "SCADA sisteminin yenilenecek olması" as a factor. Indicator PG.1.1.1 "SCADA Sisteminin Yenilenme Oranı (%)" has a 2025 baseline of 0 and a 2029 target of 100, owned by Bilgi İşlem Dairesi Başkanlığı.
↗ Ankara Büyükşehir Belediyesi (operator) — SCADA control centre, 10 March 2011DATED 10 MARCH 2011 — the figures here are fifteen years old and are not current; search engines surface them as if they were. ASKİ's then general manager: "Ankara genelindeki 106 su deposu, 59 pompa istasyonu, 93 ölçüm noktası SCADA sistemine bağlıdır." Describes a 24-hour main control centre with three operators per shift. Used here only to establish that centralised SCADA control predates 2011.
↗ Songur, Dabanlı, Yılmazel & Şenyel Kürkçüoğlu (peer-reviewed) — Afyon Kocatepe Univ. J. Sci. Eng. 21(6), 2021Published 31 December 2021"Su Dağıtım Şebekelerindeki Fiziki Kayıpların Önlenmesinde SCADA'nın Önemi: ASKİ Örneği". Studies a district metering area in Gölbaşı without SCADA: minimum night flow rose again a year after remediation, i.e. creating a metering zone without continuous monitoring does not hold the gain. Supports the mechanism, not the citywide percentages.
↗ Memurlar.net (press) — report on Sayıştay audit, 4 January 2026Secondary reporting of the Court of Accounts audit: ~38% for 2019-2020, 36.35% for 2021, above 30% for 2023-2024, against a Ministry of Agriculture and Forestry regulatory ceiling of 30% for 2023. Frames losses as "kamu zarar riski". The underlying Sayıştay report itself was NOT retrieved — the year-by-year percentages here rest on this press account, while the 42%/25% figures rest on ASKİ's own plan.
↗ İSKİ / atlas cross-reference (operator)Istanbul comparison point already in the atlas as istanbul-scada-water: non-revenue water 22.3% (2019) falling to 18.6% (2024).
Show your work What this page rests on and what it can’t tell you · all 6 claims with their sources · the forensic record

Evidence Passport · public beta 6 addressable claims, 5 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.

Inspect the claims, one by one — verbatim text, sources and caveats for all 6

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-09446e1ab3e2a381 descriptive
ASKİ runs Ankara's drinking-water network from a single SCADA control centre, staffed around the clock, with reservoirs, pump stations and network measurement points reporting in so that leaks and failures can be found without waiting for a burst to surface
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The operator's then general manager stated that 106 water reservoirs, 59 pump stations and 93 measurement points across Ankara were connected to the SCADA system, describing a 24-hour main control centre with three operators per shift.
Caveat
That page is dated 10 March 2011 and its figures are fifteen years old, although search engines surface them as if current. It is used here only to establish that centralised SCADA control predates 2011 — no start year for the original system could be established from any source, so none is claimed.

Sources carrying this claim

  1. Ankara Büyükşehir Belediyesi (operator) — SCADA control centre, 10 March 2011
Claim 2 clm-a1c6e22bc81abaef quantitative
the utility's own 2025-2029 strategic plan opens the planning period at a 42% loss rate and sets 25% as the target for 2029
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The plan's core performance indicator table gives a plan-period opening value of 42 and an end-of-plan target of 25 for the loss-and-leakage rate, with strategic goal 1.5 being to reduce it.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. ASKİ (operator) — 2025-2029 Strategic Plan, PDF
Claim 3 clm-8b84fa74ee549fdc quantitative
The same plan lists "high loss rate" among ASKİ's self-declared weaknesses and records SCADA renewal as 0% complete in 2025, due to reach 100% only in 2029
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The plan's own SWOT lists the high loss-and-leakage rate as a weakness and the forthcoming SCADA renewal as a factor; indicator PG.1.1.1, the SCADA system renewal rate, carries a 2025 baseline of 0 and a 2029 target of 100, owned by the IT directorate.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. ASKİ (operator) — 2025-2029 Strategic Plan, PDF
Claim 4 clm-08f1d83e475c83a1 quantitative
Turkish press citing Court of Accounts (Sayıştay) audits reports roughly 38% for 2019-2020, 36.35% for 2021 and above 30% for 2023-2024
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The press account of the audit gives roughly 38 per cent for 2019-2020, 36.35 per cent for 2021 and above 30 per cent for 2023-2024, against a ministry regulatory ceiling of 30 per cent for 2023, and frames the losses as a risk of loss to the public purse.
Caveat
The underlying audit report itself was not retrieved: these year-by-year percentages rest on this press account, while the 42 and 25 per cent figures rest on the utility's own plan.

Sources carrying this claim

  1. Memurlar.net (press) — report on Sayıştay audit, 4 January 2026
Claim 5 clm-69a68910323d794f quantitative
Istanbul's İSKİ, running the same SCADA-and-district-metering playbook, reports 18.6%
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The Istanbul comparison point already in the atlas records non-revenue water falling from 22.3 per cent in 2019 to 18.6 per cent in 2024 under the same architecture.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. İSKİ / atlas cross-reference (operator)
Claim 6 clm-cb2da8476911e575 quantitative
the gap between 18.6% and 42% is not explained by which of them owns the technology. A control room tells you where the water is going; it does not replace the pipe
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The peer-reviewed study of a district metering area in Gölbaşı without SCADA found that minimum night flow rose again a year after remediation — creating a metering zone without continuous monitoring does not hold the gain. Against that mechanism, the utility's own plan still opens at 42 per cent and schedules its SCADA renewal to finish only in 2029.
Caveat
The study supports the mechanism, not the citywide percentages, and the comparison between the two cities is the entry's own.

Sources carrying this claim

  1. Songur, Dabanlı, Yılmazel & Şenyel Kürkçüoğlu (peer-reviewed) — Afyon Kocatepe Univ. J. Sci. Eng. 21(6), 2021
  2. ASKİ (operator) — 2025-2029 Strategic Plan, PDF
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-21-source-dates effective 2026-08-06 · created 2026-08-22

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:1438eac284e89f07bf31e96f503740341da1871315fd395f4dd796229e4e0757
6
of 6 claims mapped
5
source dossiers
3
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
ASKİ (Ankara Su ve Kanalizasyon İdaresi / Ankara Water and Sewerage Administration)
Actor types
utility
Funding model
utility
Funding description
Not recorded
Cost
Not recorded
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

5 source dossiers

ASKİ (operator) — 2025-2029 Strategic Plan, PDF aski.gov.tr · 3 linked claims

Open original source ↗

Stable source ID
src-896681cc1c283be6
Publisher
Name not classified · aski.gov.tr
Type / language
pdf · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-06
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Primary source, text extracted directly. Core performance indicator table gives plan-period opening value 42 and end-of-plan target 25 for "Kayıp Kaçak Oranı (%)". Strategic goal 1.5 is "Kayıp kaçak oranını düşürmek". The SWOT lists "Kayıp kaçak oranının yüksek olması" as a weakness and "SCADA sisteminin yenilenecek olması" as a factor. Indicator PG.1.1.1 "SCADA Sisteminin Yenilenme Oranı (%)" has a 2025 baseline of 0 and a 2029 target of 100, owned by Bilgi İşlem Dairesi Başkanlığı.

Descriptive only — not page/paragraph exact
Ankara Büyükşehir Belediyesi (operator) — SCADA control centre, 10 March 2011 ankara.bel.tr · 1 linked claim

Open original source ↗

Stable source ID
src-88c00c57addcb736
Publisher
Name not classified · ankara.bel.tr
Type / language
web-page · language not classified
Published
2011-03-10
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-06
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

DATED 10 MARCH 2011 — the figures here are fifteen years old and are not current; search engines surface them as if they were. ASKİ's then general manager: "Ankara genelindeki 106 su deposu, 59 pompa istasyonu, 93 ölçüm noktası SCADA sistemine bağlıdır." Describes a 24-hour main control centre with three operators per shift. Used here only to establish that centralised SCADA control predates 2011.

Descriptive only — not page/paragraph exact
Songur, Dabanlı, Yılmazel & Şenyel Kürkçüoğlu (peer-reviewed) — Afyon Kocatepe Univ. J. Sci. Eng. 21(6), 2021 dergipark.org.tr · 1 linked claim

Open original source ↗

Stable source ID
src-c717d95314198bb3
Publisher
Name not classified · dergipark.org.tr
Type / language
web-page · language not classified
Published
2021-12-31
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-06
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

"Su Dağıtım Şebekelerindeki Fiziki Kayıpların Önlenmesinde SCADA'nın Önemi: ASKİ Örneği". Studies a district metering area in Gölbaşı without SCADA: minimum night flow rose again a year after remediation, i.e. creating a metering zone without continuous monitoring does not hold the gain. Supports the mechanism, not the citywide percentages.

Descriptive only — not page/paragraph exact
Memurlar.net (press) — report on Sayıştay audit, 4 January 2026 memurlar.net · 1 linked claim

Open original source ↗

Stable source ID
src-cabe7356b9a40bbc
Publisher
Name not classified · memurlar.net
Type / language
web-page · language not classified
Published
2026-01-04
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-06
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Secondary reporting of the Court of Accounts audit: ~38% for 2019-2020, 36.35% for 2021, above 30% for 2023-2024, against a Ministry of Agriculture and Forestry regulatory ceiling of 30% for 2023. Frames losses as "kamu zarar riski". The underlying Sayıştay report itself was NOT retrieved — the year-by-year percentages here rest on this press account, while the 42%/25% figures rest on ASKİ's own plan.

Descriptive only — not page/paragraph exact
İSKİ / atlas cross-reference (operator) iski.istanbul · 1 linked claim

Open original source ↗

Stable source ID
src-65cd0c60eac0cb95
Publisher
Name not classified · iski.istanbul
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-06
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Istanbul comparison point already in the atlas as istanbul-scada-water: non-revenue water 22.3% (2019) falling to 18.6% (2024).

Descriptive only — not page/paragraph exact
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.

Continue exploring

Compare this project

Same architecture, four answers: how much water is lost?

Four utilities run the recognised playbook — SCADA, district metering, pressure and night-flow monitoring. What separates them is not the technology but what they can show for it, and whether they publish a loss rate at all.

Same architecture, four answers: how much water is lost? — side-by-side comparison of 4 atlas entries; the "Cost" column honestly shows "not public" where no figure was ever published.
ProjectSinceStatusOutcomeEvidenceRun byCostWhat the instrumentation produced
Casablanca Real-Time Water Network Monitoring (Aquadvanced)Casablanca, 🇲🇦 Live Ongoing Official Utility or public operator not public The whole network under permanent district metering with thousands of fixed acoustic sensors — every performance figure self-reported by the private operator.
ISKI Centralized SCADA Water Balancing StrategyIstanbul, 🇹🇷 2008 Live Ongoing Official Utility or public operator not public The same playbook with the steadiest published result: non-revenue water down from 22.31 per cent to 18.63 per cent over five years.
ASKİ SCADA Network and Ankara's Water LossesAnkara, 🇹🇷 Live Ongoing Official Utility or public operator not public Identical architecture, opposite outcome: the utility's own strategic plan opens at a 42 per cent loss rate.
SEAAL Water and Sewerage Remote-Control CentreAlgiers, 🇩🇿 2008 Live Ongoing Media Utility or public operator not public Hundreds of sites polled since 2008 and no network-efficiency or loss rate published at all — the one number that would settle it.

Explore the wider context

📎 Cite this project

1001 Smart Cities (2026). “ASKİ SCADA Network and Ankara's Water Losses” — Ankara, Turkey. The Smart City Atlas. https://1001smartcities.org/projects/ankara-aski-water-loss/ (last verified 2026-08-06). Data: CC BY 4.0.

The underlying data is free to reuse with attribution — see the open data page.