Antananarivo's utility publishes, week by week, when the power will go out. The schedule outlived the government it helped bring down — 12-hour cuts sparked the 2025 protests, and the forecasts kept appearing.

Evidence🏛️ Officialgrades the sourcing — this entry states no impact figure
what does this mean?The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →
Scale🏙️ City-wide
FundingJirama (state utility)

Part of 1001 Smart Cities — 1,167 documented projects · 🏙️ 2 more in Antananarivo · 🔌 Smart grid & energy guide · ⚡ Energy projects

Madagascar's state water-and-power utility Jirama publishes weekly 'prévisions de coupures' for the Antananarivo interconnected grid (Direction RIA) — dated, area-level forecasts of when the electricity will go out, archived on its website continuously from July 2024 through August 2026. In June 2024 the same operator added daily water-rotation plans ('tours d'eau') for nine areas of the capital, publishing which quartiers get water in which overnight window against a production gap it put at about 60,000 m³ a day. The schedules manage scarcity rather than cure it: outages stretching to 12 hours a day beyond any published plan helped ignite the September 2025 Gen Z protests, in which Jirama offices were attacked and the government fell — and the forecasts have kept appearing under the new administration.

Live 📅 since 2024

🎓 Lesson

A published rationing plan is a data layer, and an honest one: it documents what the utility cannot deliver. In Antananarivo the gap between schedule and reality turned political — the protests that toppled the president began over cuts the calendar could no longer contain.

Sources

↗ Jirama — Communiqués (operator archive)Weekly 'Prévisions de coupures' for Direction RIA archived continuously from July 2024 into August 2026 (e.g. 'du 10 au 16 juillet 2026').
↗ 2424.mg — La Jirama publie également un calendrier de délestage pour l'eau (12 June 2024)Daily water-rotation plan for nine named sites (Mandroseza, Ankatso, Alasora, Ambohidrapeto, Ampitatafika, Anosiala, Ankaraobato, Iavoloha, Analamahitsy); per-quartier overnight service windows; ~60,000 m³/day production gap per Jirama.
↗ Wikipedia — 2025 Malagasy protestsProtests from 25 Sept 2025 sparked by water and power cuts lasting up to 12 hours at a time in Antananarivo; Jirama offices attacked; government fell in October 2025.

Continue exploring

Compare this project

When the power is short: four utilities, four things published

None of these adds a megawatt. Each is a data layer laid over a shortage, and what the utility chooses to publish decides what a household can do about it — and what the neighbours can see.

When the power is short: four utilities, four things published — side-by-side comparison of 4 atlas entries; the "Cost" column honestly shows "not public" where no figure was ever published.
ProjectSinceStatusOutcomeEvidenceRun byCostWhat the utility publishes
EDM-SA Published Load-Shedding Schedule for BamakoBamako, 🇲🇱 2024 Live Ongoing Media Utility or public operator not public When the power will go off, by neighbourhood — which turned the complaint from 'there is no power' into 'the plan is not respected here'.
Jirama Load-Shedding Forecasts and Water Rotation SchedulesAntananarivo, 🇲🇬 2024 Live Ongoing Official Utility or public operator not public A weekly forecast for power and a nightly rota for water. The gap between the schedule and the street became a political fact rather than a private one.
GECOL Prepaid Electricity MetersTripoli, 🇱🇾 2022 Live Ongoing Official Utility or public operator not public Who has paid, and nothing about supply — so a household can be cut off twice, for two unrelated reasons.
Holding Its Own Customers Below the National Load-Shedding StageCape Town, 🇿🇦 2015 Live Ongoing Independent Utility or public operator ≈R1.2bn budgeted in 2023 for Steenbras: about R1bn refurbishment and expansion plus about R200m maintenance over nine years Nothing, and it does not need to: the city dispatches a pumped-storage scheme it already owned and simply sheds less than it was told to.

Explore the wider context

📎 Cite this project

1001 Smart Cities (2026). “Jirama Load-Shedding Forecasts and Water Rotation Schedules” — Antananarivo, Madagascar. The Smart City Atlas. https://1001smartcities.org/projects/antananarivo-jirama-load-shedding/ (last verified 2026-08-07). Data: CC BY 4.0.

The underlying data is free to reuse with attribution — see the open data page.

✉️ Get the next source-checked smart-city project in your inbox

One short email a week: the Landmark, one Insight, the new cities. No spam, one-click unsubscribe. About the newsletter · RSS