Green Axes Eixample

🤖 AI-generated summary · 🔎 Last verified

This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.

How this atlas is made · What “last verified” means · What “source-checked” means

Four streets became green axes by 2023, meant as the start of converting one in three in the district. The city has since ruled out further expansion on cost, and a court has ordered part of Consell de Cent reverted.

Evidence🏛️ Officialgrades the sourcing — this entry states no impact figure
what does this mean?The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →
Scale🏘️ District

Part of 1001 Smart Cities — 1,167 documented projects · 🏙️ 19 more in Barcelona · 🏞️ Public space guide · 🚲 Mobility projects

Four Eixample streets — Consell de Cent, Rocafort, Comte Borrell and Girona — were rebuilt into car-light green axes with four new squares by 2023, part of a plan to eventually convert one in three district streets. The Collboni administration has since ruled out further expansion, citing cost, and a court has ordered part of the Consell de Cent axis reverted; the city is appealing.

Live 📅 2022–2023

Sources

↗ Ajuntament de Barcelona (authority)Official page by the city on the four built green axes and squares.
↗ Ara (press)March 2025: Catalonia's high court upholds the ruling against the Consell de Cent axis; city appeals to the Supreme Court.
↗ RegenUrb (research)Further information on the project's design and built scope.

Continue exploring

Compare this project

The superblock, four times, and what happened after the ribbon

One idea — push through-traffic to the perimeter and give the inside back to people — built four times over a decade. Read in order, the set is less about design than about what survives a change of administration and a court.

The superblock, four times, and what happened after the ribbon — side-by-side comparison of 4 atlas entries; the "Cost" column honestly shows "not public" where no figure was ever published.
ProjectSinceStatusOutcomeEvidenceRun byCostWhere it stands
Superblock PoblenouBarcelona, 🇪🇸 2016 Live Succeeded Official City government not public The pilot that set the method: cheap tactical materials first, concrete later. Traffic on the inner streets fell by well over half, and the perimeter barely moved.
Superblock Sant AntoniBarcelona, 🇪🇸 2018 Live Succeeded Media City government not public The version that got an independent health verdict — the city's public health agency measured a quarter less nitrogen dioxide inside the pedestrianised area.
Green Axes EixampleBarcelona, 🇪🇸 2022 Live Scaled back Official City government not public The scale-up that stopped. Four streets were rebuilt, further expansion has been ruled out on cost, and a court has ordered part of one axis reverted.
Viennese Supergrätzl (Superblocks)Vienna, 🇦🇹 2022 Live Ongoing Official City government not public The copy abroad, with the evaluation built in from the start: traffic counts, microclimate modelling and a resident survey, and no outcome data claimed until they report.

Explore the wider context

📎 Cite this project

1001 Smart Cities (2026). “Green Axes Eixample” — Barcelona, Spain. The Smart City Atlas. https://1001smartcities.org/projects/green-axes-eixample/ (last verified 2026-07-18). Data: CC BY 4.0.

The underlying data is free to reuse with attribution — see the open data page.