Camwater Smart/Prepaid Water Metering Program
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
21 sourced claims on this page, none individually verified yet — turn on “Sources in the text” to see each one.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
Camwater promised 3,000 smart meters for Yaoundé and Douala in 2020. In August 2026 it awarded a contract for 3,000 again — and no one has published what the first batch did.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →Part of 1001 Smart Cities — 1,247 documented projects · 🏙️ Yaoundé city profile · 💧 Water guide · 🌱 Environment projects
Camwater, Cameroon's public water utility, has pursued smart/prepaid water metering for its Yaoundé and Douala networks since 2020, when it ran a restricted international tender and presented a pilot phase covering 3,000 meters split between the two cities — aimed at replacing manual meter reading with phone- or card-based prepaid recharging to cut billing disputes and revenue losses. A 2021 press report questioned whether the pilot had stalled, the supplier later said it had installed about 1,500 prepaid meters in Bonabéri, in Douala, in 2021, and no source gives a count for Yaoundé. In June 2026 Camwater issued a new international tender (budget ~1 billion FCFA, financed through the Ministry of Water and Energy's Public Investment Budget under the PFORR IMPACT program) for supply, installation and commissioning of an intelligent metering system, with a delivery period the notice gives as both 180 and 200 days. In August 2026 it awarded the contract — 3,000 smart meters for CFA721.76 million — to China's Hangzhou Laison Technology, naming Bonabéri in Douala and Odza in Yaoundé as pilot areas; the first installations were not expected before October 2026.
Sources
Show 1 more sourcesShow fewer
📅 How old is the evidence?
Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: since 2020. 6 of 6 sources carry a publication date, from 9 March 2020 to 1 September 2026.
When the sources were published
- StopBlaBlaCam · pressStopBlaBlaCam — March 2020 restricted international tender for a technical partner
- Journal du Cameroun · pressJournal du Cameroun — 2020 pilot presentation, 3,000-meter Yaoundé/Douala scope, prepaid recharge mechanism
- Actu Cameroun · pressactucameroun.com (Feb 2021) — questions where the promised smart meters went
- Agence de Régulation des Marchés Publics (ARMP, Cameroon) · oversight bodyARMP (Cameroon's public procurement regulator) — 2026 tender listing
- 237online · press237online.com (July 2026) — renewed rollout coverage
- Business in Cameroon · pressBusiness in Cameroon — Camwater awards 3,000-meter smart-meter contract (Sept 2026)
Show your work What this page rests on and what it can’t tell you · all 21 claims with their sources · the forensic record
Evidence file · public beta 21 addressable claims, 6 source dossiers, one permanent baseline. The file is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 21
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-14ff7c1565cc536d
descriptive
Camwater, Cameroon's public water utility
Sources carrying this claim
clm-ee4e46a52ab24bff
quantitative
since 2020, when it ran a restricted international tender
Sources carrying this claim
clm-4bec882de0d4438c
quantitative
presented a pilot phase covering 3,000 meters split between the two cities
Sources carrying this claim
clm-a7dc83476da82b1f
descriptive
replacing manual meter reading with phone- or card-based prepaid recharging
Sources carrying this claim
clm-d3b08e296d58ff4e
descriptive
to cut billing disputes and revenue losses
Sources carrying this claim
clm-3e729040f3de0889
quantitative
A 2021 press report questioned whether the pilot had stalled
Sources carrying this claim
clm-b5ee0d0d309250e6
quantitative
the supplier later said it had installed about 1,500 prepaid meters in Bonabéri, in Douala, in 2021
Sources carrying this claim
clm-5f93c7abae4b09bb
descriptive
no source gives a count for Yaoundé
Sources carrying this claim
clm-ec287702f7e04b4a
quantitative
In June 2026 Camwater issued a new international tender
Sources carrying this claim
clm-892d7724f346a84e
quantitative
budget ~1 billion FCFA
Sources carrying this claim
clm-ef8a8f91f75695c3
descriptive
financed through the Ministry of Water and Energy's Public Investment Budget under the PFORR IMPACT program
Sources carrying this claim
clm-86a075550bae3e30
descriptive
for supply, installation and commissioning of an intelligent metering system
Sources carrying this claim
clm-ebce4135c39c14a8
quantitative
with a delivery period the notice gives as both 180 and 200 days
Sources carrying this claim
clm-cff045c9141cfbf4
quantitative
In August 2026 it awarded the contract — 3,000 smart meters for CFA721.76 million — to China's Hangzhou Laison Technology
Sources carrying this claim
clm-79a5edaf19bfea0b
descriptive
naming Bonabéri in Douala and Odza in Yaoundé as pilot areas
Sources carrying this claim
clm-9eeeb17f95888dd0
quantitative
the first installations were not expected before October 2026
Sources carrying this claim
clm-0c304e36cef7570f
quantitative
No result was recorded in 2025
Sources carrying this claim
clm-e8fa39c9a7006ebf
quantitative
as of June 2026 the World Bank, which ties part of its IDA financing to the programme, rated the revenue indicator for smart-metered areas off track
Sources carrying this claim
clm-68f53c22562b036e
quantitative
no published assessment shows how the 2021 pilot meters performed or what revenue they brought in
Sources carrying this claim
clm-f05de8284912fda9
descriptive
A pilot that is announced, tendered and tendered again without a published result cannot teach the next round anything
Sources carrying this claim
clm-a21bcebb360ecf78
quantitative
the 2026 contract documents do not say whether the new meters supplement, replace or restart the ones installed in 2021
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:1dcb414f2e368647f9ddda19efff07e095a3eb28771fbdc21febd13fe679a886
- 21
- of 21 claims mapped
- 6
- source dossiers
- 6
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Camwater (Cameroon Water Utilities Corporation)
- Actor types
- utility
- Funding model
- mixed
- Funding description
- Not recorded
- Cost
- CFA721.76 million (2026 contract for 3,000 meters; tender estimate CFA1 billion)
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
6 source dossiers
Journal du Cameroun — 2020 pilot presentation, 3,000-meter Yaoundé/Douala scope, prepaid recharge mechanism
- Stable source ID
src-0d30721f75b5f04b- Publisher
- Name not classified · fr.journalducameroun.com
- Type / language
- web-page · language not classified
- Published
- 2020-08-20
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-11-03
- Dossier created
- 2026-11-04
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
20 August 2020: Camwater presented its smart meters to consumer associations; a pilot of 3,000 meters is planned in Yaoundé and Douala, rechargeable by phone or card, to reduce meter readers and billing complaints.
StopBlaBlaCam — March 2020 restricted international tender for a technical partner
- Stable source ID
src-411f2fc687e1f738- Publisher
- Name not classified · stopblablacam.com
- Type / language
- web-page · language not classified
- Published
- 2020-03-09
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-11-03
- Dossier created
- 2026-11-04
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
March 2020: restricted international tender among four named consortia for a technical partner to deploy smart meters for Camwater's more than 400,000 consumers, tested first on two sites in Yaoundé and Douala; rationale: unreliable manual reading and billing complaints.
actucameroun.com (Feb 2021) — questions where the promised smart meters went
- Stable source ID
src-3eb704c0f73c5dfd- Publisher
- Name not classified · actucameroun.com
- Type / language
- web-page · language not classified
- Published
- 2021-02-15
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-11-03
- Dossier created
- 2026-11-04
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
February 2021 report asking where the smart meters promised in 2020 had gone.
- Claims linked
ARMP (Cameroon's public procurement regulator) — 2026 tender listing
- Stable source ID
src-db5ff904d723be95- Publisher
- Name not classified · armp.cm
- Type / language
- web-page · language not classified
- Published
- 2026-06-04
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-11-03
- Dossier created
- 2026-11-04
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Open international tender of 3 June 2026 (urgent procedure) for supply, installation, testing and commissioning of a smart water-metering system; estimated cost CFA1 billion; financed from the public investment budget through the Ministry of Water and Energy while also citing the IMPACT programme's IDA credit; delivery period stated as 180 days in one section and 200 days in another.
237online.com (July 2026) — renewed rollout coverage
- Stable source ID
src-5a238ba3730b403f- Publisher
- Name not classified · 237online.com
- Type / language
- web-page · language not classified
- Published
- 2026-07-07
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-11-03
- Dossier created
- 2026-11-04
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
July 2026: a three-year pilot phase announced for Yaoundé and Douala under the IMPACT programme; awareness sessions under way, no meters yet installed.
- Claims linked
- Background source; no baseline claim points here
Business in Cameroon — Camwater awards 3,000-meter smart-meter contract (Sept 2026)
- Stable source ID
src-ad9c8d3591f77707- Publisher
- Name not classified · businessincameroon.com
- Type / language
- web-page · language not classified
- Published
- 2026-09-01
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-11-03
- Dossier created
- 2026-11-04
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Camwater awarded Hangzhou Laison Technology a CFA721.76 million contract (decision of 17 August 2026) for 3,000 smart meters, the first 7.5% of 40,000 planned under the World Bank-backed IMPACT programme; pilot areas Bonabéri (Douala) and Odza (Yaoundé); first installations not expected before October 2026. As of 30 June 2026 the World Bank rated the smart-meter revenue indicator 'off track'. Laison says it installed about 1,500 prepaid meters in Bonabéri in 2021; no public assessment of how they performed exists.
Known limits of this file
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Camwater Smart/Prepaid Water Metering Program” — Yaoundé, Cameroon. The Smart City Atlas. https://1001smartcities.org/projects/yaounde-camwater-smart-water-meters/ (last verified 2026-11-03). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.